Rolly
/ Moderator

May 11, 2003, 10:29 AM
Post #1 of 5
(1416 views)
Shortcut
|
Building Project Update for 10 May 2003
|
Can't Post | Private Reply
|
We've been in a Spring heat wave -- over 100f (40c) every day this week. I don't see how the guys can take the afternoon heat. I try to get to the job around 7AM, and I'm out of there by noon. Enrique and/or I made 8 trips to various stores for material – that’s a little less than usual. Ruben and I made a trash run to the town dump. That was interesting and smelly – more damn flies than I ever saw in one place. This week we got the main electrical lines run from the breaker boxes in the utility rooms to the front wall where the electric meters will be. More ceiling fans are up. Coco installed window screens for two more units; only his own house is without screens. All the floor tile is done and three and a half kitchens have counter tile. Showers and bathroom walls are next. All the painting inside and out is done. There are a few touchups to take care of. I think we witnessed a miracle this week. We found another door maker who promised to do the 4 interior doors in Martha's house in ten days. He told us on Friday that he would come on Monday, a day early, to install the doors. The ladies are still clamoring to more in by the end of this month. A couple of them have bought some new furniture and had it delivered to the job. There is no way the houses will be finished. We may have water and power, but all the cabinetry will not be done, and there will probably not be front doors. Stay tuned. This week's pictures are at www.rollybrook.com/05-10-03.htm Rolly E-visit me http://Rollybrook.com On Facebook as Rolly Brook
(This post was edited by Rolly on May 11, 2003, 10:31 AM)
|